I've been ill- now I'm back and going to convalesce with my Pirate...see you all soon.
All is Well :-)
Friday, 25 May 2012
happy
Just very happy.....and busy!!
and the weather has turned hot.
We're off to the allotment any minute, to plan greenhouse extending, possibly.
Then it will be down to the Velodrome for the Cycling Club Cardiff session tonight.
No pictures until I find the lead...but I've been a bit pre-occupied, so who knows where it has gone!!
Oh, by the way RDG, not dragon but hare...and that is very good (for a serpent)!!
and the weather has turned hot.
We're off to the allotment any minute, to plan greenhouse extending, possibly.
Then it will be down to the Velodrome for the Cycling Club Cardiff session tonight.
No pictures until I find the lead...but I've been a bit pre-occupied, so who knows where it has gone!!
Oh, by the way RDG, not dragon but hare...and that is very good (for a serpent)!!
Tuesday, 22 May 2012
More cycling!
This time I got a lift into Cardiff first!! Which meant a nice five mile ride to St Ffagan and I was then nicely warmed up for work!
The sun has come out even brighter and hotter today- and I was riding home from 1.15 to 3.15.
I walked up the steep bit on this hill....
which is the bit in the distance- there is downhill and flat before it.
I arrived at the garage just as my car was being tested...it took all of 15 seconds to diagnose as it dumped water in the pit!! Unfortunately Pug have discontinued the heater hoses at the rear...scrapyard time...a job for The Oily One who knows where there are two diesel 405s!!
I know the car is 15 years old, and the last time they put this engine in a car was 10 years ago...but they do have a reputation for longevity!!
Now I'm getting a lift to Abergavenny to The Grand Kiln Opening!!
The sun has come out even brighter and hotter today- and I was riding home from 1.15 to 3.15.
I walked up the steep bit on this hill....
which is the bit in the distance- there is downhill and flat before it.
I arrived at the garage just as my car was being tested...it took all of 15 seconds to diagnose as it dumped water in the pit!! Unfortunately Pug have discontinued the heater hoses at the rear...scrapyard time...a job for The Oily One who knows where there are two diesel 405s!!
I know the car is 15 years old, and the last time they put this engine in a car was 10 years ago...but they do have a reputation for longevity!!
Now I'm getting a lift to Abergavenny to The Grand Kiln Opening!!
Monday, 21 May 2012
definitely Monday...
The water leak from the car has increased- so it should be easier to locate. Unfortunately (?) that meant that I had to commute by bike. I chose the road bike, it being a lighter beast.
I found that I was limited...I couldn't use the two bottom gears...so down dale was fine, but uphill was a slow pedal followed by a slower walk. At least Spring is now giving us proper May weather!!
Sheep heads made, gears slipping and jumping, I slowly made my way the three miles to where The Oily One works. It is called Cardiff Pedal Power!! They hire all sorts of bikes there and he is, not surprisingly, the mechanic there....
My bike had a twist in the gear hanger, as well as cable outers showing their age.
Hopefully things are now running true and the gear and brake cables have had attention.
I thought of riding another twenty miles...another two hours with my lack of fitness....
and wimped out!! I had flapjacks and real coffee, a sit in the sun on the bench, and a nice natter with The O.O. Funny how you only realize how tired you are when you stop!
Then a lift home...bliss!!
Unfortunately I forgot that I was supposed to go out to a meeting this evening...but talking on the phone to a friend did me much more good!
I found that I was limited...I couldn't use the two bottom gears...so down dale was fine, but uphill was a slow pedal followed by a slower walk. At least Spring is now giving us proper May weather!!
Sheep heads made, gears slipping and jumping, I slowly made my way the three miles to where The Oily One works. It is called Cardiff Pedal Power!! They hire all sorts of bikes there and he is, not surprisingly, the mechanic there....
My bike had a twist in the gear hanger, as well as cable outers showing their age.
Hopefully things are now running true and the gear and brake cables have had attention.
I thought of riding another twenty miles...another two hours with my lack of fitness....
and wimped out!! I had flapjacks and real coffee, a sit in the sun on the bench, and a nice natter with The O.O. Funny how you only realize how tired you are when you stop!
Then a lift home...bliss!!
Unfortunately I forgot that I was supposed to go out to a meeting this evening...but talking on the phone to a friend did me much more good!
Sunday, 20 May 2012
weekend saltglaze firing
All in!!
Cones, draw rings and one of my boxes
Francis Drake coming to check!
Draw ring being taken out to check firing progress
All twelve out by the end of adding salt....now we wait until Tuesday evening, hopefully, for the Grand Opening
Thursday, 17 May 2012
curate's egg...
as he said to the bishop when asked how was his egg...."good, in parts"...
All the slip decorated pots have problems...ones I haven't had in thirty years of decorating with slip, either earthenware or stoneware.
However the rest are quite nice.
then there are lots of jugs
and at the back of the bottom shelf I put two bowls to re-fire. I wasn't too worried if they spoilt or got over cooked.....
but they turned out well! (glaze, "old yeller")
The kiln is looking a bit sicker too- I've photographed the movement in the arch/roof, to compare it with last time, but I think it might have to be re-built inside very soon.
All the slip decorated pots have problems...ones I haven't had in thirty years of decorating with slip, either earthenware or stoneware.
However the rest are quite nice.
then there are lots of jugs
and at the back of the bottom shelf I put two bowls to re-fire. I wasn't too worried if they spoilt or got over cooked.....
but they turned out well! (glaze, "old yeller")
The kiln is looking a bit sicker too- I've photographed the movement in the arch/roof, to compare it with last time, but I think it might have to be re-built inside very soon.
results
In between kiln checking and tweaking, yesterday's sunshine got me inspired...as well as the lack of housework help getting me riled....
The kitchen is mostly de-cluttered although still waiting for some electrickery and carpentry.
The hall and stairs have been painted Incarnidine Red...that was chosen just over a year ago after much pachwork painting of test pots!
I ran out of time to take a load to the local recycling centre, even though it closes at 7pm....
I've peeked in the kiln-
and it looks good...but is too hot to touch!
I'm pleased with this little dragon jar- I hope the lid isn't stuck! If it is ok when it comes out of the kiln, this one is going to a friend who loves dragons although he isn't Welsh or Chinese...I'm not sure, but he might be a Dragon himself!
The kitchen is mostly de-cluttered although still waiting for some electrickery and carpentry.
The hall and stairs have been painted Incarnidine Red...that was chosen just over a year ago after much pachwork painting of test pots!
I ran out of time to take a load to the local recycling centre, even though it closes at 7pm....
I've peeked in the kiln-
and it looks good...but is too hot to touch!
I'm pleased with this little dragon jar- I hope the lid isn't stuck! If it is ok when it comes out of the kiln, this one is going to a friend who loves dragons although he isn't Welsh or Chinese...I'm not sure, but he might be a Dragon himself!
Subscribe to:
Posts (Atom)














