It was hot...but Fife friend and Pirate started at 8, and our cycling joiner arrived before 10. So nearly all the preparation work was done before he arrived, thankfully.
It isn't the roofing I had planned...but is half the cost....
Plan B....sell lots of work so that we can change it in a couple of years' time!!
Between having plenty of breaks for drinks and cooling down, the window didn't get fitted...but the groundwork has been done, fitting hopefully on Thursday.
Fife friend and Pirate have moved the doors to the front..now it is my turn with the paintbrush!
Meanwhile, I was on catering duty and hold this duty...and have you seen that?????.....
And in between times I lifted the shallots and they are in the polytunnel to dry off, cleaned the earth from the garlic crop, and after a welcome shower of cooling rain (it reached a good 27⁰C today) sowed carrots, beetroot and dwarf french beans.
And the potted rose in the greenhouse looks as if it is doing its job of attracting pollenators to the tomatoes and cucumbers....and the courgette that is lurking at the back!!
6 comments:
OMG that building is BEAUTIFUL 🤩!!! The light roof is stunning-/even if plan b.
—Fresca (phone won’t let me sign in)
Well done, coming on nicely.
Good job on the building! I think the roof looks terrific!
Wow, that is looking rather good now! You have battled the weather with the construction though.
I probably missed what it will end up being used for - please remind me! xx
It will have my Saviac potters wheel on one side of the new bit..hope back to clay work soon!
Just seen a photo on IG💗 - here is to returning to clay work xx
Post a Comment